Prepare your trip to Romania
Before entering Romania
Source checked: November 2026
Road charges and documents
Check the category and charge on the official portal using your vehicle documents; keep confirmation. Entry conditions depend on nationality and route.
Money and payments
The currency is the leu (RON). Ask whether the campsite accepts cards; carry cash for small places and check the currency of the quoted total.
Pets and camping outside campsites
Check pet documents before departure. Outside campsites, ask the landowner and check local rules; permission to park does not establish permission to camp.
Gas bottles and compatibility
Send the supplier a photo of the bottle and connector; confirm exchange and compatibility. Use authorised filling providers, not automotive LPG pumps for portable bottles.
7, 14 and 21-day routes
Days in Romania, excluding international travel: 6, 13 or 20 nights. Suggestions, not reservations. Keep transfer days for driving and supplies; split long transfers if needed.
Check the road route for your vehicle dimensions. Do not depend on a seasonal alpine pass or tow into historic centres.
7 days · 6 Nights
Distances cover campsite transfers, excluding excursions and travel to or from home. Car routing does not check caravan restrictions; confirm the route and final approach. No live arrival times or road conditions.
Stage 1: Camping Ananas, Cisnadioara (Sibiu) · 3 Nights
Cisnadioara (Sibiu) · Sibiu
Ideas for your days here
Arriving with a caravan
Arriving with a caravan
- Final approach road
- Not established
- Length and weight
- Not established
Gate width, gradient and turning space are not documented here. Ask the host about your outfit dimensions.
Stage 2: Vampire Camping, Bran (Brasov) · 3 Nights
Bran (Brasov) · Brasov
~140 estimated road km · OSRM/OSM car profile
Ideas for your days here
Arriving with a caravan
Arriving with a caravan
- Final approach road
- The operator describes a firm access road and parking surface; gate width is not published. · Published information · vampirecamping.ro · November 2026
- Length and weight
- Not established
Gate width, gradient and turning space are not documented here. Ask the host about your outfit dimensions.
~140 estimated road km · OSRM/OSM car profile · Distances estimated in November 2026
14 days · 13 Nights
Distances cover campsite transfers, excluding excursions and travel to or from home. Car routing does not check caravan restrictions; confirm the route and final approach. No live arrival times or road conditions.
Stage 1: Camping Countryside Retezat, Nucșoara · 3 Nights
Nucșoara · Hunedoara
Ideas for your days here
Arriving with a caravan
Arriving with a caravan
- Final approach road
- Arrival until 22:00; departure until noon. Ask for the recommended village entrance and a pitch suited to your outfit. · Published information · camping-retezat.com · November 2026
- Length and weight
- Not established
Gate width, gradient and turning space are not documented here. Ask the host about your outfit dimensions.
Stage 2: Camping Ananas, Cisnadioara (Sibiu) · 3 Nights
Cisnadioara (Sibiu) · Sibiu
~164 estimated road km · OSRM/OSM car profile
Ideas for your days here
Arriving with a caravan
Arriving with a caravan
- Final approach road
- Not established
- Length and weight
- Not established
Gate width, gradient and turning space are not documented here. Ask the host about your outfit dimensions.
Stage 3: Vampire Camping, Bran (Brasov) · 3 Nights
Bran (Brasov) · Brasov
~140 estimated road km · OSRM/OSM car profile
Ideas for your days here
Arriving with a caravan
Arriving with a caravan
- Final approach road
- The operator describes a firm access road and parking surface; gate width is not published. · Published information · vampirecamping.ro · November 2026
- Length and weight
- Not established
Gate width, gradient and turning space are not documented here. Ask the host about your outfit dimensions.
Stage 4: Dorna Eco Camping · 4 Nights
· Suceava
~299 estimated road km · OSRM/OSM car profile
Ideas for your days here
Arriving with a caravan
Arriving with a caravan
- Final approach road
- The operator lists direct asphalt-road access. · Published information · dornaecocamping.eu · November 2026
- Length and weight
- Not established
Gate width, gradient and turning space are not documented here. Ask the host about your outfit dimensions.
~603 estimated road km · OSRM/OSM car profile · Distances estimated in November 2026
21 days · 20 nights
Camping Ananas, Cisnadioara (Sibiu) · 3 nights
Cisnadioara (Sibiu) · Sibiu
Camping Aquaris · 2 nights
· Mures
Dorna Eco Camping · 4 nights
· Suceava
Vampire Camping, Bran (Brasov) · 3 nights
Bran (Brasov) · Brasov
CampoEuroClub · 4 nights
· Tulcea
MALUL MARII ® · 4 nights
· Constanta
